What We Do

Services

The full list of deck work taken on, from framing to finish.

Home › Services

Everything we take on

Every job below is one we do ourselves across Daphne.

Deck Installation

We build decks from pressure-treated pine or composite boards, set on concrete footings poured below grade. Joists go down at 16 inches on center, and the ledger board gets flashed before a single board goes on, since that's where most rot starts. Most jobs run two to three weeks depending on size and whether we're waiting on a permit inspection.

Deck Repair

Soft spots in the decking, wobbly railings, and joists that have started to sag are the calls we get most. We pull boards to check the frame underneath before patching over it, because a new board over a rotten joist fails again within a year. Sometimes the fix is a few boards and some hardware, sometimes it's half the substructure.

Deck Staining & Sealing

Alabama humidity is hard on exposed wood, and pressure-treated pine left unsealed will gray and crack within a season or two. We pressure wash first, let the boards dry for a couple of days, then apply a penetrating stain rated for Gulf Coast sun and rain. Plan on resealing every one to two years to keep water out of the end grain.

Custom Deck Design

Multi-level decks, built-in benches, a pergola over part of the deck, the layout gets built around how you actually use your yard, not a stock plan. We walk the site, check the grade, and figure out where footings can go before anything gets drawn up.

Composite Decking

Composite boards like Trex or TimberTech don't rot and don't need staining, which matters if you don't want a sealing job on your calendar every spring. The substructure underneath still has to be built right, joists spaced correctly and the ledger flashed, since composite can hide water damage underneath longer than wood does.

Deck Railing Installation

Alabama code calls for railings on any deck over 30 inches off the ground, with balusters spaced so a 4-inch sphere can't pass through. We build wood, cable, and aluminum railing systems, and check post spacing against the span before setting anything, since a railing that flexes isn't attached right.

Deck Resurfacing & Board Replacement

If the frame underneath is solid but the decking itself is cupped, splintering, or worn out, we strip it down to the joists and start fresh with new boards. It's a faster, cheaper job than a full rebuild when the substructure checks out.

Screened Porch & Deck Combos

A lot of homeowners here want part of the deck open and part of it screened in to get out of the no-see-ums in the evening. We frame the screened section separately so it carries its own roof load, then tie the open deck in alongside it.

Pool Deck Building

Pool decks take more abuse from standing water and pool chemicals than a regular deck, so fasteners rated for that get used and boards get spaced a little wider for drainage. Composite or capped PVC decking holds up best around a pool, since bare pressure-treated wood near chlorinated splash gets rough fast.

Deck Demolition & Removal

Old decks that are rotted past saving need to come out before anything new goes up on the same footprint. We haul off the old lumber and check the footings underneath, since sometimes they're reusable and sometimes they're not up to current code.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Daphne, AL

This is the ground covered for deck installation and repair work.

Daphne, AL
Mobile, AL
Fairhope, AL
Foley, AL
Saraland, AL
Gulf Shores, AL
Bay Minette, AL
Spanish Fort, AL
Robertsdale, AL
Orange Beach, AL
Loxley, AL
Silverhill, AL
Common Questions

Things worth asking

Questions that come up once a deck project is actually underway.

Do I need a permit to build a deck?
Most decks over 30 inches off the ground need a building permit and an inspection in Baldwin County and the surrounding municipalities. Lower, ground-level platforms sometimes skip the permit requirement, but it depends on the local jurisdiction, so it's worth checking before building.
How long does a deck build take?
A straightforward ground-level deck usually takes one to two weeks from footings to final boards. A multi-level deck with railings, stairs, and a screened section can run three to five weeks, more if permit inspections cause delays.
Can a deck be built to fit a tighter budget?
Pressure-treated pine costs less upfront than composite decking and keeps a project within a tighter budget. Simpler railing styles, fewer levels, and standard board spacing instead of custom patterns also bring the number down without cutting corners on the frame.
Is deck work guaranteed?
Workmanship on framing, footings, and fastening is guaranteed, and manufacturer warranties on composite decking and hardware get passed along to the homeowner. Any settling or movement in the first year tied to the build itself gets fixed at no charge.
Who handles the project day to day, is it the same person throughout?
One point of contact handles the project from the first walkthrough through final inspection, so questions don't bounce between different people. The crew on site can answer day-to-day questions, but the main point of contact signs off on changes.
What decking material is recommended?
Pressure-treated pine is the lower-cost option and holds up well if it's stained and sealed every year or two. Composite boards cost more upfront but skip the yearly sealing and hold their color longer in Gulf Coast sun, which matters on a deck that gets full afternoon light.
Can the yard still be used while the deck is being built?
Most of the yard stays usable during a deck build, though the immediate work area gets fenced off or roped for safety while footings are dug and lumber is cut. Access to the back door through the work zone is usually limited for a few days during framing.
Is there anything to do to prepare the yard beforehand?
Clearing furniture, grills, and potted plants off the existing deck or patio area before the crew arrives speeds things up. Marking the location of buried sprinkler lines or dog fence wire near the dig area also helps avoid surprises once footings start going in.
What happens if rot or damage is found once old decking is pulled up?
If joists, the ledger board, or framing underneath turn out to be rotted once old decking comes off, that gets flagged and priced before any new material goes on. It's common enough on repair and resurfacing jobs that it's built into the conversation from the start, not treated as a surprise upcharge.
How should a new deck be maintained?
Pressure-treated wood decks need a pressure wash and a fresh coat of sealer every one to two years to keep water out of the grain. Composite decking just needs regular washing to keep pollen and mildew film off the surface, no sealing required.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (251) 758-1330